ABOUT ME
Completed more 30 MEP Projects with successful 3 of them are Oil& Gas
- General ManagerNovelty for Cleaning and Maintenance2021-now
Manage all the work started from the projects beginning up to projects handing over to the client
- MEP Projects ManagerArison Gulf2018-2021
Duties & Responsibilities (Electrical , Plumbing, Telecom, Fire alarm ,HVAC, Firefighting and Low current system) :
1. Estimate for the new project and prepare the BOQ when required.
2. Electrical and Low current system designed where required
3. Supervise for installation of hardware and software for pumping (Sewerage , Irrigation, lifting and Water) station include SCADA.
4. Submit a technical submission, Catalogue and data sheet for the materials which required for the project and coordinate between a Vendor and consultant to get approval.
5. Arrange a shop drawing for the project.
6. Make required plane for the project to execute the work from start to end ( Man power , Machines , Tools ,Materials and work procedures ) .
7. Order the materials required to the project specially long delivery items .
8. Prepare all required documents such as MS(Method statement) ,ITP (Inspection test plan),QCP (Quality control procedure),JSA (Jop safety analysis)
9. Aware and Trained for all safety procedure such as Work at height, Confide space ,Excavation ,First Aid and Firefighting and implement it in the site and ensure its applied in the site.
10. Manage all the site works activities during start to handing over.11. Ensure and follow up with engineers that the work was executed as project specification ,BOQ and contract document .
12. Follow up with consultant and the client to handed over the project.
13. Prepared monthly bill and statement for the completion works.
14. Interact with local authorities and consultant to get approval for shop drawing where required.
15. Attend consulting and client meeting for technical inquires and issues
16. Manage the job for all other subcontract which required to the project
17. Prepare daily/monthly report for high management about work progress.
18. Where require raised technical inquiries for a missing conception between drawing and the site.
19. Good experience for Installation for Cathodic Protection for Piles/Pile caps and buildings
20. Aware of civil defense, Etisalat and ADDC/FEWA/DEWA rules and specifications .
21. Closing the project after handing over to the client.
22. Where required making MEP design drawings. - MEP Projects ManagerEnvicon Emirates2010-2018
Same as above
- MEP Projects ManagerOrion Contarcting2009-2010
Same As Above
- MEP Projects EngineerAli Contarcting2007-2009
Same As Above
- Electrical Power EngineerMinistry of Energy and Natural Resources2003-2007
1. Worked in Project department for Erection of EHV substations from 22kv, 66kv & 220kv that includes preparation of Estimates, Tenders, Supervision of Erection works, measurements & recording of bills of contractors.
2. The engineering management to all devices/equipments which used in the substation, such as feeder 22 KV.3. Prepare daily report & follow up the power load status for the electrical networks.
4. Follow up & supervise Maintenance works & reinstall existing feeder.
5. Reinstall all transformer and networks in the black out case.
6. Coordinate other electrical works with the for auto transfer generation and distributions department.
7. Prepare full inspection report to all switch yard and switch gear devices
8. Prepare routine test and check for all used device9. Re-design & prepare all necessary works for the changing/auto-transferring in the power generation and distribution network.
10. Supervise installation of the protective special devices for the high and medium voltage.
- Electrical EngineerIslamic University1997-2002
Graduated as electrical engineer
- Safety Awards2018
Follow the safety rules and instructions